2006 - 2015, an Overview of Progress Made

 

 

arrow49_L.gif


Summer 2015: straightened and stabilized by internal shear walls (invisible from the outside), walls repaired, roof rebuilt, countless tons of pebbles removed inside and out, walkways and boat ramp rails dug out, new doors built and installed, windows repaired, walls and rails painted. Result: a little gem welcoming visitors.

Arrow "next picture"

Some Highlights of 2016